Test of tensile strength on a connection in AK and OK configurations on a 20 mm PE pipe.
Operating pressure: 24 bar. The tensile force is applied to the connection with a steel rope on a pulley loaded with weights totaling 100 KG. The value of the force and the entire test procedure – according to DIN PN-EN 712